Ahmedabad lake restoration
Flagship water bodies across the region, scored by status severity, cultural prominence and restoration pressure, the active restoration programmes and the court orders shaping them.
Shailesh R. Shah v. State of Gujarat, (2002) 3 GLR 447
Gujarat High Court (Division Bench): directed the State to notify every lake and pond in Gujarat in the Official Gazette within three months and keep them as water bodies, never alienated; to prescribe and monitor water-quality standards; to rejuvenate them through a declared, phased desilting programme with storm-water recharge; to set up a Water Resources Council and Committee; to record and remove encroachments in accordance with law and the Government's rehabilitation policies; and to determine and notify a no-construction belt around each lake. Petition filed over the protection of lakes in and around Ahmedabad and the removal of encroachments from survey no. 353 at Chandola Lake.
LawBeat coverage →Fuljaha Noormohammed Shaikh and others v. State of Gujarat and others
Gujarat High Court: refused to stay the clearance of structures at Chandola Lake, holding that 'Chandola Lake is a water body and on a water body, no construction can be permitted', and left the petitioners free to apply individually for housing under the State's rehabilitation schemes. It disposed of the petition on 24 July 2025, recording that the demolition had been carried out. The 29 April order's text is as quoted in the Court's judgment of 16 March 2026 in R/SCA 2301/2026, which the link opens. Petition filed over the clearance of homes on the lake land before any rehabilitation at Chandola Lake.
LawBeat coverage →Samsuddin Jainulabiddin Shaikh and others v. State of Gujarat and others
Gujarat High Court: rejected the prayer to halt the clearance until the petitioners were rehoused, no document having been produced to justify the structures on lake or government land, and directed that individual applications for alternative housing under the State's rehabilitation scheme be considered in accordance with law. Petition filed over the clearance of homes near the lake before rehabilitation at Chandola Lake.
LawBeat coverage →In re: news item on water bodies vanishing in Ahmedabad
National Green Tribunal, Western Zone Bench: added the State's Urban Development and Urban Housing Department and AMC as respondents and asked them to reply within four weeks, after the Gujarat Pollution Control Board said it held no specific details of the water bodies identified in the city and pointed to the High Court's 2002 directions. The matter was next listed for 22 January 2026. Petition filed over a newspaper report of 9 June 2025, on which the Tribunal registered the case, that by a civic body report some of Ahmedabad's water bodies had 'vanished'.
LawBeat coverage →Navneetlal Vanmalidas Khakhkhar (Thakkar) and others v. Ahmedabad Municipal Corporation
Gujarat High Court: upheld AMC's notice of 8 September 2025 to remove structures from the lake land, holding that construction on a water body is contrary to the Gujarat Land Revenue Code, 1879. A Division Bench dismissed the appeal on 2 December 2025 and declined to stay the notice. Petition filed over a notice to vacate homes and a temple on lake land that the Collector allotted to AMC in 2009 for development and beautification at Isanpur Lake.
LawBeat coverage →Ashokbhai Kanjibhai Chavda and others v. Ahmedabad Municipal Corporation and others
Gujarat High Court: dismissed the challenge to AMC's notices of 6 November 2025 to vacate structures on revenue survey no. 258, holding that no construction is permissible without permission on government land or a water body, and left the petitioners free to apply to AMC for rehabilitation under any available scheme. Petition filed over AMC notices, issued on a State Government direction to develop and beautify the pond, to clear homes from the pond land at Kamal Talav (Umla Talavdi), Naroda.
LawBeat coverage →Restoration programmes touching Ahmedabad - 10
AMC counts 176 lakes within its limits. By February 2026 development was complete at 43, under way at 13, and planned at 22 more: 15 new lakefronts and 7 re-developments or second phases (Budget 2026-27, PDF p.166). The work covers deepening, compound walls, roads, gardens, lighting, inlets, toilets, recharge wells and bringing catchment water in (PDF p.165). In its 2020-21 budget AMC counted 122 lakes (PDF p.138); the budgets we read do not say what changed between the two counts.
Stated programme cost Rs 100.00 crore (PDF p.165). Shakri lake completed at Rs 17.50 crore; Makarba, Hebatpur and ABD Kachariyu lakes under way at Rs 19.72 crore from AMC's own funds (PDF p.166). Planned: 15 lakefronts at Rs 80.00 crore and 7 re-developments at Rs 40.00 crore (PDF p.166), and gardens at 24 lakes at Rs 51.00 crore (PDF p.181). The English climate annex groups the planned lakefronts as 21 lakes, a different list (PDF p.321).
Storm-water lines that carry rain from each lake's surrounding catchment into the lake. Of 176 lakes, the network is complete at 80, under way at 51, and planned at the remaining 45 (Budget 2026-27, PDF p.166; English climate annex, PDF p.321).
Rs 10.00 crore for catchment-to-lake works in 2026-27 (PDF p.166).
Eight AMC projects on the AMRUT 2.0 portal, Rs 63.02 crore in all. Completed: Ognaj village lake (Rs 8.60 crore), Okaf (Rs 12.74 crore) and Bhadaj (Rs 7.93 crore). Contract awarded: Ropda (Rs 3.76 crore), Vadu at Ramol (Rs 10.13 crore), a mini STP at Asarwa lake (Rs 9 crore), Muthiya (Rs 6.05 crore) and Hathijan (Rs 4.81 crore).
Portal figures as read on 14 October 2026; the portal dates no project. AMC's 2026-27 budget (February 2026) gives different figures for the same lakes: Bhadaj and Okaf under way at Rs 24.92 crore combined, Hathijan and Naroda-Muthiya under way at Rs 15.61 crore, and Ramol Vadu and Ropda under way at Rs 20.47 crore (PDF p.165). Its English annex lists Bhadaj, Ognaj and Okaf as work in progress (PDF p.323). Both are stated here.
Sola, Shilaj, Lal Bahadur Shastri (Malek Saban) and Gota (phase 1) lakes developed and complete; Mumatpura lake under way at Rs 5.54 crore (Budget 2026-27, PDF p.165). The English annex names Jagatpur and Mumatpura as SJMMSVY lake works in progress (PDF p.323).
Rs 63.88 crore for the four completed lakes. The 2025-26 budget listed Shakri in the same Rs 63.88 crore group, then in progress (PDF p.196); the 2026-27 budget lists Shakri separately, completed at Rs 17.50 crore.
Phase 1 beautification in Danilimda ward, under way at Rs 36.38 crore in both the 2025-26 (PDF p.196) and 2026-27 budgets (PDF pp.102 and 166). Phase 2 is planned for the coming year (PDF p.104), with a lake garden at Rs 4.50 crore (PDF p.181).
Phase 2 is Rs 40.00 crore in the South zone works list (PDF p.104); the lake section lists it inside a seven-lake group whose total is also Rs 40.00 crore (PDF p.166). Both are stated; the budget does not reconcile them.
New lake interlinking in the South West zone, Rs 76.00 crore and 24% complete, and in the East zone, Rs 78.00 crore and under way (Budget 2026-27, PDF p.133).
The 2026-27 budget gives the city's grant as Rs 250.00 crore from the Centre and Rs 25.00 crore from the State, and its total as Rs 270.00 crore (PDF p.133). The 2024-25 budget gives the same two parts and a total of Rs 275.00 crore (PDF p.138).
Linking 6 lakes in Town Planning Schemes 217, 41 and 301 and pumping their storm water to the Gota-Godhavi canal, Rs 40.00 crore; and a line from Rajathal through Chebli lake to Bopal lake, Rs 8.00 crore (Budget 2026-27, PDF p.166).
Of the 24,000 homes AMC plans to build, 3,200 are listed under removing encroachments from lakes, which the budget classes as untenable slums (Budget 2026-27, PDF p.190).
Rs 410.00 crore in the 2026-27 budget. The 2025-26 budget gave about 4,000 homes at Rs 600.00 crore for the same purpose (PDF p.215).
Rebuilding the lake's edge and precinct as a public lakefront, begun in 2006 (Budget 2026-27, PDF p.176). HUDCO's compendium describes a 2.25 km pedestrian promenade and notes the lake 'represented a source of aquifer recharging'.
About Rs 36 crore (AMC Budget 2026-27, PDF p.176); Rs 36.00 crore (HUDCO Best Practice Awards compendium, p.34).
In 2020 AMC counted 122 lakes, 26 developed and 96 still to be developed, and submitted a Rs 452.90 crore DPR for 45 of them to the Gujarat Urban Development Mission under the National Plan for Conservation of Aquatic Ecosystems: 17 lakes over 5 hectares in phase 1 (Rs 310.59 crore) and 28 lakes of 2.5 to 5 hectares in phase 2 (Rs 142.31 crore) (Budget 2020-21, PDF p.138).
Centre Rs 271.74 crore, State Rs 181.16 crore (PDF p.139). The same budget's opening note says 28 lakes had been developed, not 26 (PDF p.4). The 2023-24 budget planned Jagatpur lake and a 2 MLD STP under the NPCA grant (PDF p.147).
Flagship water bodies - 8
AMC began rebuilding the lakefront in 2006 at about Rs 36 crore and opened it to the public in January 2009, after the Kankaria Carnival of 25 to 31 December 2008 (AMC Budget 2026-27, PDF p.176). HUDCO's awards compendium gives completion as December 2008 at Rs 36.00 crore. The 72 acres is the 1866 measurement; the record we hold has no current official water-spread figure.
builder: Sultan Qutb-ud-din, who completed it in 1451 - fed by in 1879, a stream rising west of the Bokh, turned towards Kankaria and Chandola by a dam near Kamod (Bombay Gazetteer, p.50)
A regular polygon of 34 sides, each 190 feet long, ringed with cut-stone steps, with a carved inlet sluice and an island garden, Nagina, reached by a viaduct (Hope and Fergusson 1866, pp.50-51). By 1781 it lay in ruin; the Collector, Mr Borradaile, began restoring it in 1872 (Bombay Gazetteer 1879, pp.17-18). AMC's 2020-21 budget calls the lakefront the model for lake development in other cities (PDF p.4).
Phase 1 beautification is under way at Rs 36.38 crore from AMC's own funds, and phase 2 is planned (AMC Budget 2026-27, PDF pp.102, 104 and 166). From April 2025 AMC cleared structures from the lake land; the Gujarat High Court refused to stay the clearance, holding that 'Chandola Lake is a water body and on a water body, no construction can be permitted' (R/SCA 6119/2025, order of 29 April 2025). Area: 121 hectares (about 299 acres) with a 525-hectare command area, per the State Irrigation Department's affidavit to the High Court in 2000.
builder: Not named in the sources we hold; an irrigation tank handed to the Public Works Department by a Government of Bombay order of 3 April 1916 - fed by the Khari Cut canal from the Khari river at Raipur, built between 1878 and 1881 partly to fill this tank; AMC's 2023-24 budget says a branch of the canal still runs through Jashodanagar, Khokhra and Ghodasar to fill the lake (PDF p.149)
The 1879 Bombay Gazetteer describes an earth-embanked circular reservoir about two miles south of the city near Shah Alam's tomb, covering 181 acres, with 291 acres assessed as irrigable from it, though it 'seldom retains any depth of water long after the close of the rains' (p.17). In 2000 the Irrigation Department told the High Court that urban growth had ended its use for irrigation (Shailesh R. Shah v. State of Gujarat, 2002).
AMC's 2026-27 budget records its development, with Sola, Shilaj and Gota (phase 1) lakes, as completed at a combined Rs 63.88 crore under the Swarnim budget head (PDF p.165). The 2019-20 budget had reported an earlier development of 'Lal Bahadur Shastri lake in Bapunagar' as complete (PDF pp.143-144). The 71 acres is the 1879 measurement.
The 1879 Bombay Gazetteer describes the Malik Shaban lake, two and a quarter miles east of the city near Rakhial, as 'hardly inferior in size' to Kankaria: stone built, octagonal, 71 acres, its sides in good order but its bed 'so silted up as to hold no depth of water' (p.18). AMC's budgets give the lake both names.
AMC's 2025-26 budget gives its renovation as under way at Rs 9.89 crore (PDF p.126) and, on another page, at Rs 7.3 crore (PDF p.196). The 2026-27 budget lists Vastrapur among lakes where development work has been carried out (PDF p.218) and, in its English climate annex, among lake works in progress (PDF p.323). Both readings are stated; the budgets do not reconcile them.
builder: Ahmedabad Urban Development Authority, before 2003, per AMC's 2025-26 budget (PDF p.126)
Area 51,761 sq m on the west side of the Sabarmati. In 2023-24 AMC recorded structural damage to the retaining wall, walking path and amphitheatre steps and decided to renovate the lake (Budget 2023-24, PDF p.180); in 2022-23 it had listed its development at Rs 5.00 crore as work in progress (PDF p.138).
The Collector allotted the lake land to AMC on 20 June 2009 to develop and beautify the lake. AMC's notice of 8 September 2025 to vacate structures on the lake land was upheld by the Gujarat High Court on 14 November 2025 and on appeal on 2 December 2025. AMC's 2026-27 budget lists a lake garden here at Rs 2.00 crore (PDF p.181).
The revenue record gives the survey number as 95,608 sq m with land use 'Talav'; the town-planning map shows 95,639 sq m as water body (Town Planning Scheme 53, final plots 160 to 162, as recorded in the High Court's orders).
On revenue survey no. 258 in Town Planning Scheme 97 (Naroda-North), Sardarnagar ward. AMC served notices on 6 November 2025 to vacate structures on the pond land, citing a State Government direction to develop and beautify the pond; the Gujarat High Court dismissed the challenge on 28 November 2025. AMC's 2026-27 budget lists it among 15 lakes planned for lakefront development (Rs 80.00 crore for the group, PDF p.166) and a lake garden at Rs 2.00 crore (PDF p.181).
AMC's 2026-27 budget records its development as complete at Rs 17.50 crore (PDF p.165). The 2025-26 budget had listed Shakri inside the Rs 63.88 crore Swarnim group with Sola, Shilaj, Lal Bahadur Shastri and Gota lakes, then in progress (PDF p.196).
Two official areas: 6,263 sq m in AMC's 2022-23 budget (PDF pp.91 and 139) and 78,858.49 sq m in its 2023-24 budget (PDF p.180). Both are stated; neither budget explains the difference.
AMC's 2026-27 budget lists its renovation at Rs 6.00 crore among the West zone's works for the coming year (PDF p.95), names it in the seven-lake re-development and phase 2 group (Rs 40.00 crore for the group, PDF p.166), and includes it in the English climate annex's 21 planned lakefronts (PDF p.321).
Not the Malav lake at Dholka, which the 1879 Bombay Gazetteer places in the regency of Minal Devi, mother of the Solanki king Siddhraj (1094-1148) (p.18). The record we hold gives no history or area for the Vasna lake.
Methodology: Ahmedabad's lake record is a municipal programme with a court docket beside it. AMC's budgets count 176 lakes and report progress on each; the Gujarat High Court's 2002 directions on gazetting and protecting water bodies, and its 2025 orders upholding the clearance of lake land, set the legal frame. Where AMC's budget and the AMRUT 2.0 portal disagree on the same lakes, both are stated.